17 Jul Construction projects in Canada receive the materials they need
Our EUROPORTS team at the General Cargo Terminal in Rostock is showcasing their efficiency. They have been working around the clock to ensure the smooth handling of a massive 6,200 tonnes of steel. Four block trains, arriving from Risa, were unloaded efficiently and safely, and the steel was stored at our terminal. Today, it is being loaded onto the vessel using our mobile harbor cranes. This impressive operation underscores EUROPORTS‘ dedication to both safety and efficiency, guaranteeing that construction projects in Canada receive the materials they need without delay.
#Euroports #Logistics #Steel #Shipping #Safety #Efficiency #Cargo #Bulk #SupplyChain #Warehousing #Maritime
Visit us on LinkedIn EUROPORTS:

